Solar & Storage Selection Guide

Prepare a project brief that connects the load, PV equipment, inverter, storage and charging requirements.

Start with the Load

List peak power, daily energy use, simultaneous loads and backup duration. Separate critical loads from loads that may be disconnected during an outage.

Match PV and Conversion Equipment

Collect module Voc, Vmp, Isc and temperature coefficients. Have the system designer check cold-weather string voltage, input current, MPPT operating range, phase and grid connection requirements.

Specify Storage Duty

State the usable energy required, continuous and peak output, charge/discharge schedule, grid or generator operation and installation environment. Battery kWh and PCS kW describe different limits.

Include Auxiliary Solar

For monitoring, RV or portable charging, provide the receiver input voltage/current limits, connector and polarity. Regulated USB output power can be lower than the panel rating.

Review the Whole Interface

Confirm mounting, electrical protection, cable requirements, controls and commissioning responsibilities with the responsible project designer before ordering.